Skip to content

New GenAI & AI agent development

Cloud, DevOps & Infrastructure

Cloud Migration Services

We assess, plan and move applications, databases and data to AWS, Azure or Google Cloud, with rehearsed cutovers and rollback plans so your teams keep running throughout.

  • Workload assessment
  • Migration waves
  • Data replication
  • Rollback planning
Years of delivery
8+
Years of delivery
Projects shipped
350+
Projects shipped
Clients across US, UK, AU & SG
200+
Clients across US, UK, AU & SG

What’s included

Everything You Need to Move to the Cloud With Minimal Downtime

We plan, execute and stabilise your move, from application discovery through cutover and post-migration support.

  • Application Discovery & Dependency Mapping

    We inventory servers, databases and integrations so nothing is missed and surprises do not derail your migration date.

    • Asset inventory
    • Dependency map
  • Migration Strategy: Rehost, Replatform, Refactor

    We assign each workload the right 6R approach, balancing speed, cost and long-term benefit for your business.

    • 6R strategy matrix
    • Wave plan
  • Landing Zone & Network Setup

    We build secure accounts, networking and access controls first, so migrated workloads land in a governed, production-ready environment.

    • Landing zone
    • VPN / VPC design
  • Server & Application Migration Execution

    We move virtual machines and applications in planned waves, keeping your teams working and downtime inside agreed windows.

    • Migration waves
    • Rollback plan
  • Database & Data Migration with Validation

    We replicate and verify your data with minimal write freezes, so records arrive intact and reporting stays accurate.

    • Data replication
    • Validation report
  • Migration Testing & Performance Validation

    We test functionality, load and failover in the new environment before cutover, so users see no regressions.

    • Test results
    • Cutover checklist
  • Cutover Management & Go-Live Support

    We run the cutover runbook with your team, handle DNS and traffic switching, and stay on call through go-live.

    • Cutover runbook
    • Go-live support
  • Post-Migration Optimisation & Decommissioning

    We right-size resources and retire legacy hardware so you start saving on data centre costs quickly.

    • Right-sizing report
    • Decommission plan

Need something specific?

Why Kramate

Why Business Owners Choose Kramate for Moving to the Cloud

Your business keeps running while we move it, and you always know what happens next.

  • Moves Planned Around Your Quiet Hours

    Instead of

    your shop or site going dark in busy times

    With Kramate

    We pick the move time with you, usually nights or weekends when fewer people are online.

  • A Way Back If Something Goes Wrong

    Instead of: a move you cannot undo

    With Kramate: We keep your old setup running until the new one is checked and you say go.

  • A Date and a Price Set First

    Instead of: a move that drags on with no end

    With Kramate: You get a move date and a fixed price before we touch anything of yours.

  • A Full List of What You Have

    Instead of: forgotten pieces breaking after the move

    With Kramate: We count every program and file you rely on before we start, and show you the list.

  • We Stay Close After the Move

    Instead of: being left alone on day one

    With Kramate: We stay on call through the first days in the new home, ready for your questions.

Our approach

How We Run Your Cloud Migration, Step by Step

A careful move of your applications and data to the cloud, with checks before and after.

7 clear steps 7 deliverables you keep

  1. Workload Assessment

    We list every application, server and database you run, then decide which should move, which should stay and why.

    You receive: Workload list

    You confirm what must move

  2. Data Migration Plan

    We choose how each system moves, set the order and agree a quiet time for the final switch.

    You receive: Migration plan

    You approve what moves first

  3. Cloud Account Setup

    We set up your new cloud account with safe networks, user logins and rules before anything moves across.

    You receive: Ready cloud account

    You name who needs access

  4. Trial Move

    We copy a small, low-risk system first to prove the method works and to find surprises early.

    You receive: Trial result

    You check the trial system works

  5. Check Before Cutover

    We compare old and new side by side, test speed and confirm that your data arrived complete.

    You receive: Test report

    You sign off the test results

  6. Switch-Over Day

    We switch users to the new setup at the agreed time and keep a way back ready.

    You receive: Live cloud system

    You approve the switch time

  7. Settle and Switch Off

    We watch the first weeks, fix small issues and then shut down the old servers safely.

    You receive: Old servers retired

    You confirm the old setup can go

Tools & technologies

Technologies We Use for Cloud Migration

We use proven migration, automation and cutover tools so workloads move with little downtime.

  • AWS: Amazon cloud hosting and services.
  • Azure: Microsoft cloud hosting and services.
  • Google Cloud: Google infrastructure for data, AI and applications.
  • VMware: Virtualisation for running workloads on-premise or in hybrid setups.
  • Terraform: Defines cloud setups as code so they can be repeated.
  • Ansible: Automates server setup and configuration without manual steps.
  • Packer: Builds ready-to-run machine images the same way every time.
  • AWS CloudFormation: Defines AWS resources as templates that deploy repeatably.
  • Bicep: Defines Azure resources as code in a clear, readable format.
  • Docker: Packages software so it runs the same everywhere.
  • Kubernetes: Runs and scales containerised software automatically.
  • Helm: Packages Kubernetes apps so they install and upgrade consistently.
  • GitHub Actions: Automates testing and releases on every code change.
  • Jenkins: Runs automated builds, tests and releases on every change.
  • GitLab: Hosts code and runs CI/CD pipelines in one platform.
  • Grafana: Dashboards and alerts for live system metrics.
  • k6: Load tests apps to prove they cope with real traffic.
  • Bash: Shell scripting that automates routine operations tasks.

Cloud migration services move applications, data and supporting infrastructure from on-premises servers or another hosting arrangement into a cloud environment, while keeping the business running. The hard part is rarely copying files. It is deciding what to move, in what order, with which changes, and how to switch over without surprising customers.

This guide is organized around the migration itself: the strategies available for each application, how work is grouped into waves, what a safe cutover looks like, and what usually goes wrong. It also covers security, regional rules, cost drivers and how to choose a partner.

If you are still deciding whether to move at all, start with cloud consulting and return here once the target is clear.

Cloud migration services: choosing a strategy for each application

Cloud migration services start with one idea: there is no single best approach. Each application gets its own treatment. The industry commonly describes a set of "Rs", and the AWS Prescriptive Guidance (opens in a new tab) library and the Microsoft Cloud Adoption Framework for Azure (opens in a new tab) both document migration patterns along these lines.

Common migration strategies compared
StrategyWhat changesEffort and riskGood fit
Rehost (lift and shift) Move servers as they are Lowest effort, benefits are limited Deadline-driven moves, stable systems
Replatform Small changes, such as a managed database Moderate Systems where operations burden is high
Refactor Redesign for cloud-native patterns Highest effort, largest long-term gain Core products that must scale or change quickly
Repurchase Replace with a software-as-a-service product Moderate, includes data and training Commodity functions such as email or HR
Retain Leave where it is for now None now Regulatory limits, recent investment, special hardware
Retire Switch off Saves effort entirely Unused or duplicated systems

Some frameworks add a seventh option, relocate, for moving whole virtualization platforms. Whatever the label, insist that every application is assigned one strategy and a reason.

Discovery and assessment: what to learn before moving

Surprises during cutover almost always trace back to something missed in discovery. A sound assessment builds a dependency map, not just a server list. Typical reasons to move include a data center lease or hardware refresh, resilience needs, demand peaks and unsupported software.

  • Inventory: applications, servers, databases, licenses and owners.
  • Dependencies: which systems talk to which, over what ports and on what schedule, including batch jobs and file transfers nobody remembers.
  • Performance baselines: how much CPU, memory, storage and network each system actually uses, so sizing in the cloud is based on measurement.
  • Licensing: which software licenses allow cloud use and under what terms.
  • Data profile: volumes, growth, sensitivity and how long a copy will take over your network.
  • Business calendar: month-end, seasonal peaks and freeze periods that block cutovers.

Wave planning, testing and cutover with minimal downtime

Large estates are moved in waves: groups of related applications migrated together. Early waves contain low-risk systems so the team builds the foundation, tooling and confidence before the critical applications arrive.

  1. Build the landing zone with identity, networking, logging and guardrails in place.
  2. Pilot wave: move one or two modest systems end to end and record what you learn.
  3. Replicate data continuously so the final switch only needs to move the last small changes.
  4. Test in the new environment: functional, performance, security and failure testing before cutover, not after.
  5. Rehearse the cutover with a written runbook, owners for each step and a clock.
  6. Switch traffic at a quiet time, often by gradually shifting DNS or load balancer weights.
  7. Keep the old environment available for a defined period with a tested way back.
  8. Hypercare: extra monitoring and rapid support for the first days or weeks.

Rollback is a design requirement. Decide before cutover what conditions trigger it, who makes the call and how long it takes. Downtime then becomes a plan rather than a hope. For data-heavy moves, see also data migration services.

Migration risks and how to reduce them

  • Hidden dependencies: a forgotten integration breaks after cutover. Reduce with dependency mapping and traffic observation.
  • Data loss or corruption: reduce with checksums, reconciliation counts and rehearsed restores.
  • Performance surprises: an application written for a fast local network becomes chatty and slow across locations. Reduce with load testing and placing tightly coupled systems together.
  • Security gaps: a rushed move leaves storage open or permissions too wide. Reduce with a hardened landing zone and automated configuration checks.
  • Cost shock: servers sized like the old hardware and left running continuously. Reduce with right-sizing and budgets from the first wave.
  • Skills gaps: the team can build but not operate. Reduce with training and runbooks during the program.

Aligning the program with the reliability, security and cost principles in the AWS Well-Architected Framework (opens in a new tab), the Azure Well-Architected Framework (opens in a new tab) or the Google Cloud Well-Architected Framework (opens in a new tab) gives reviewers a neutral checklist for each wave.

Security and compliance during the move

Migration widens exposure temporarily: data is copied, networks are bridged and old and new environments run side by side. Protect that period explicitly.

  • Encrypt data in transit during transfer and at rest in the target.
  • Use temporary, least-privilege migration credentials and revoke them afterward.
  • Scan and patch systems before moving them, not after.
  • Securely wipe or decommission old storage and keep evidence of it.
  • Preserve audit logs and retention obligations across the move.

The Cloud Security Alliance guidance (opens in a new tab) and the AWS Shared Responsibility Model (opens in a new tab) help confirm which controls move with you and which are now your team's job. Pair the program with cloud security services when internal capacity is thin.

Sustainability in migration decisions

Migration is the moment to avoid carrying waste forward. Retire idle servers, size to measured use rather than old hardware, and pick regions with attention to the energy sources each provider reports. After the move, schedule non-production environments to power down and review utilization regularly.

Replacing a fleet of lightly used physical servers with shared, well-utilized cloud capacity can reduce waste, but only if workloads are sized and managed with care. The Principles of Green Software Engineering (opens in a new tab) offer a practical framing.

Illustrative migration scenarios by industry

  • Healthcare: a practice-management system replatformed onto a managed database, with strict access logging and a tested restore before cutover.
  • Education: a student portal rehosted ahead of enrollment season, with refactoring of the busiest components scheduled for the following term.
  • Logistics: a tracking application with heavy batch jobs moved in a wave after its dependencies, with parallel running during peak shipping weeks avoided.
  • Professional services: file servers and email repurchased as software-as-a-service while a specialized billing system is retained on site for now.

These are illustrative, not Kramate client results.

Regional considerations: USA, UK, Australia and Singapore

Data location and cross-border transfer rules shape target-region choices. Confirm details with legal counsel.

  • USA: sector rules such as HIPAA for health data, financial regulator expectations and state privacy laws; public-sector work may need specific authorization programs.
  • UK: UK GDPR and Data Protection Act 2018, including international transfer rules; regulated financial firms face outsourcing and resilience expectations.
  • Australia: Privacy Act 1988 and Australian Privacy Principles, with extra obligations for finance and critical infrastructure.
  • Singapore: Personal Data Protection Act and sector regulator guidance on technology risk and outsourcing.

Cutovers are scheduled around local business hours, which is where time zones matter. Agree who is on call in each region for the cutover window.

Cost factors and how to plan a migration budget

Cloud migration services carry a one-time cost and a running cost. Plan for both.

  • Scope: number of applications, servers and databases, and their complexity.
  • Strategy mix: rehosting is faster to execute, refactoring costs more upfront.
  • Data volume and transfer method.
  • Parallel running: paying for old and new environments during the transition.
  • Testing depth and rehearsal cycles.
  • Licensing changes and any software replacement.
  • Training and operating-model changes.
  • Target-environment running costs: compute, storage, network traffic, managed services and support.

Fixed-price fits a well-defined wave, a dedicated team fits a multi-wave program with changing priorities, and hourly fits assessments or tuning. Keep a reserve for discovered dependencies, and plan cloud cost optimization for after the move.

How to choose a cloud migration services partner

  1. A discovery phase that produces a dependency map before any fixed quote.
  2. Per-application strategy with reasons, not one approach for everything.
  3. A rehearsed cutover and rollback plan for each critical system.
  4. Security built in: landing zone, scanning and credential hygiene.
  5. Post-migration support and knowledge transfer to your team.
  6. Provider neutrality or clear disclosure of partnerships.
  7. Visible progress through demos and wave reports.

How Kramate delivers cloud migration

A dedicated project manager coordinates each wave, with daily updates on Slack or Teams and a demo or progress review at the end of every two-week round. An NDA comes first, and all intellectual property, including runbooks and automation scripts, is transferred to you. See how we run a project for the full process.

Work happens under least-privilege access on encrypted devices, with peer review and regular security testing. Four to six hours of US Eastern overlap and full working-day overlap with the UK, Australia and Singapore help with cutover scheduling.

Frequently asked questions

What are the Rs of cloud migration?

They are labels for the options per application: rehost, replatform, refactor, repurchase, retain and retire, with some frameworks adding relocate. Each system is assigned one option based on effort, risk and business value.

Should I lift and shift or refactor?

Lift and shift is quicker and lower risk, which suits deadlines and stable systems. Refactoring costs more now but unlocks scaling and managed services. Many programs rehost first and refactor the applications that justify it.

How do you migrate with minimal downtime?

Replicate data continuously, test in the target environment, rehearse the cutover, switch traffic gradually at a quiet time and keep a tested rollback path. Downtime is then limited to the final switch.

How long does a cloud migration take?

It depends on the number of applications, their dependencies, data volumes and how quickly decisions are made. Discovery gives a workable schedule, and a pilot wave shows how fast the team really moves.

What is the biggest cloud migration risk?

Hidden dependencies are the most common cause of trouble, followed by data integrity problems and unplanned running costs. Dependency mapping, reconciliation checks, rehearsed restores and budgets from the first wave address most of them.

Do we need to stop operations during migration?

Usually not. With replication and a short, scheduled cutover, most applications stay available. Systems with very heavy write traffic may need a brief maintenance window, agreed in advance with the business, and communicated to users beforehand.

Sources and further reading

FAQ

Frequently asked questions

Cost depends on the number of applications and databases, how much data must move, how old or tightly coupled the systems are, and the approach chosen. Rehosting is lighter than refactoring. Downtime limits, testing needs and compliance also add effort. Send us your migration scope and a no-obligation estimate follows within 24 hours.

We assess and group applications, plan the landing zone, migrate a pilot, then move waves of workloads with testing and a cutover plan for each. Duration depends on how many systems you have, dependencies between them, data volume and how much downtime the business can accept.

You do. Before detailed migration talks, Kramate signs an NDA and transfers IP and deliverables to you. Migration plans, runbooks, automation scripts and target environment configuration are handed over, and the new cloud accounts remain under your control from day one.

We run joint planning with your application owners and operations staff, agree cutover windows and use your change process. Your people test each wave before sign-off. We document the new setup so your team can run it after we step back.

They are rehost, replatform, refactor, repurchase, retire and retain. Rehost moves as is, replatform makes small tweaks, refactor redesigns the app, repurchase swaps in a SaaS product, retire removes unused systems and retain leaves them in place. We assign one to each application.

We replicate data ahead of time, rehearse the cutover, schedule it for quiet hours and keep a rollback plan ready. Some systems can run in both places briefly. We cannot remove all risk, but testing and a clear fallback keep surprises small.

Prepare an application inventory, owners for each system, known dependencies, data sensitivity notes and your downtime tolerance. Clean up unused systems first, since moving them wastes effort. Decide who signs off each cutover. We can help build the inventory if it does not exist.

Taking new projects

Let’s talk about your Cloud Migration Services needs

Tell us about your project and get a free consultation and estimate within 24 hours.

  1. We reply within 4 business hours A real consultant reads your brief — no bot, no queue.
  2. 30-minute discovery call We dig into goals, constraints and budget. NDA signed on request.
  3. Proposal in 24 hours Scope, timeline, team and price — clear enough to decide on.

NDA on request You own the IP No obligation Free estimate

Your information is confidential. We’re happy to sign an NDA.

Book a free call Chat on WhatsApp