Source System Analysis & Migration Scoping
We profile your source data, volumes and dependencies, then fix scope and risks, so the migration is planned with facts.
- Data profiling report
- Migration scope
New Now offering Generative AI & AI Agent development GenAI & AI agent development Explore AI services
Services
Company
Talk to us
Data & Analytics
We plan, map and move data between databases, ERPs and cloud platforms, with reconciliation reports and rehearsed cutovers, so you switch systems on schedule without losing or corrupting records.
What’s included
We plan, move and verify your data across systems, with minimal downtime and records you can trust on day one.
We profile your source data, volumes and dependencies, then fix scope and risks, so the migration is planned with facts.
We choose big-bang, phased or parallel-run migration and map a cutover timeline that protects daily operations.
We map every source field to its target and define transformation logic, so nothing is lost or misinterpreted in the move.
We build repeatable migration jobs for databases, ERP and CRM data, so test runs and final runs behave identically.
We move on-premise databases and files to AWS, Azure or GCP using proven tooling, with minimal downtime for your users.
We compare record counts, totals and samples between systems across trial loads, so you sign off with evidence.
Encrypted transfer, masked test data and access logging protect customer and financial records throughout the migration.
We run the final cutover and stay on hand afterward to resolve issues quickly, so your team starts confidently.
Need something specific?
Why Kramate
We practise the move before the real one, so go-live day holds no surprises.
Instead of
finding problems on the real moving day
With Kramate
We run trial moves with your data until the results are clean and the team is happy.
Instead of: taking it on trust that all data arrived
With Kramate: We compare counts and totals before and after, and give you a signed list to approve.
Instead of: no plan for a failed switch-over
With Kramate: We prepare a way back to the old system before we switch, and agree it with you.
Instead of: customer details sitting in open files
With Kramate: We use scrambled copies for testing, and only named people can reach the real records.
Instead of: being left alone when problems show up
With Kramate: For a period after the switch, we stay on hand to fix issues quickly.
Our approach
We move your data to its new home and prove nothing was lost.
7 clear steps 7 deliverables you keep
We study your current systems, count records and flag duplicates, broken entries and old data you can drop.
We choose how to move, in one go or in stages, and write a cutover plan with a way back.
We match each old field to its new place and write the rules for changing formats.
We run test moves with scripts we can repeat, fixing problems each time before the real move.
We compare counts and totals between old and new, line by line, and list any differences.
We encrypt data in transit and limit who can see sensitive records during the move.
We run the final move, switch you over and stay close while your team starts using it.
Tools & technologies
We use proven migration and validation tools so every record is checked before cutover.
Expert guide
Data migration services move information from one system to another without losing, corrupting or exposing it: from an old database to a new one, from on-premises servers to the cloud, from one application to its replacement, or from several silos into a warehouse. The move itself is rarely the hard part. The hard part is that the new system must behave correctly on day one, using data created over many years.
Careful data migration services treat the move as a rehearsed, measurable event, not a single copy job.
This guide covers migration types, a phase-by-phase plan, how to prove the data arrived intact, cutover strategies, security and residency duties in the USA, UK, Australia and Singapore, cost drivers and how to pick a partner who plans for rollback.
| Type | What moves | Main risk |
|---|---|---|
| Database | Tables and stored logic between database engines or versions | Data type differences and lost business logic |
| Application | Records from a retired system into its replacement | Mismatched data models and missing history |
| Cloud | Servers and datasets from on-premises to a cloud platform | Downtime, cost surprises and access settings |
| Warehouse or lakehouse | Analytical data and pipelines between platforms | Broken reports and different calculation results |
| Storage and files | Documents and archives | Permissions and metadata lost in transit |
Migrations often accompany bigger programs such as cloud migration or legacy software modernization, where data is one workstream among several.
Each rehearsal should be faster and cleaner than the last. If the third rehearsal still surprises the team, the cutover date should move.
Trust in a migration comes from evidence, gathered in layers:
Automate these checks so they run on every rehearsal. Tools like Great Expectations (opens in a new tab) and dbt tests (opens in a new tab) can express many of them as repeatable tests. When migrating analytics platforms, vendor documentation such as Snowflake’s (opens in a new tab) and BigQuery’s (opens in a new tab) describes loading and validation options worth reviewing early.
| Approach | How it works | Best for | Trade-off |
|---|---|---|---|
| Big bang | Everything switches in one planned window | Smaller systems with a tolerable downtime window | Highest risk if something fails |
| Phased | Move by region, product or business unit | Large estates and risk-averse teams | Two systems live for a while |
| Parallel run | Both systems operate and results are compared | Finance and compliance-critical data | Double the operational effort |
| Continuous sync then switch | Replicate changes until the final moment | Systems that cannot stop for long | Needs careful change capture |
Migration creates temporary copies of your most sensitive data, often in staging areas with relaxed settings. Treat them like production: encrypt data in transit and at rest, restrict access to named people, mask personal data in test environments where possible, log all access and delete temporary copies when the project ends. The NIST Privacy Framework (opens in a new tab) offers a useful structure for assessing privacy risk across the move.
Decommissioning is part of the project. Retiring old servers and deleting obsolete copies reduces attack surface and energy use, as long as retention duties are met first.
These are illustrative scenarios, not Kramate client results.
Migrating to a new host or cloud region can change where personal data is stored and who can reach it. Check the destination before you start and confirm details with legal counsel.
Cutover windows are usually at weekends or off-peak hours, so agree staffing across time zones. Kramate provides four to six hours of overlap with US Eastern time and a full working day with the UK, Australia and Singapore.
Fixed price works once profiling is done and scope is stable. Before that, an hourly or small fixed-price assessment is safer. Keep a contingency reserve for data surprises, which nearly every migration finds.
After a free consultation you receive a detailed estimate within 24 hours. A dedicated project manager reports daily on Slack or Teams, and each two-week round ends with a review of rehearsal results. Work happens under an NDA, with encrypted devices and least-privilege access, and all intellectual property, including mapping documents and scripts, is yours. See our delivery approach for migrations for the full process.
Inventory sources, profile data quality, decide what to leave behind, map fields, rehearse repeatedly, reconcile results, then cut over with a rollback plan. Planning rehearsals and validation matters more than the copy itself.
Typical causes are unprofiled data, undocumented dependencies, too few rehearsals, no business validation and no rollback plan. Most failures are discovered late, which is why early profiling and repeatable tests matter.
Phased approaches limit the impact of a failure but keep two systems running longer. Big bang suits smaller, simpler estates with an acceptable downtime window. Critical financial data often justifies a parallel run.
Layer the checks: record counts, totals and checksums, sampled side-by-side comparisons, business-rule tests and report parity. Automate them, so every rehearsal produces the same evidence and the final cutover is not a leap of faith.
It can, because hosting location and who can access the data both change. Cross-border transfer rules, security duties and contract terms with the provider all matter, so review them with legal counsel before the move begins.
Often yes, using continuous replication and a short final switch. It needs more engineering and testing, so weigh it against the cost of a planned outage. Our database administration services can support the operational side.
FAQ
Cost depends on data volume, the number of source and target systems, how different their structures are and how much cleaning is needed. Downtime limits, rehearsal rounds and compliance needs also add effort. A like-for-like move is simpler than a restructure. We give a no-obligation estimate within 24 hours.
We profile the source, map fields, build migration scripts, run trial loads, reconcile results and then cut over. The schedule depends on data quality, how many trial rounds are needed and your allowed downtime window. Business sign-off on reconciliation often sets the final date.
You own them. Kramate signs an NDA before detailed discussions, and mapping specifications, scripts and reconciliation reports transfer to you. Data moves inside your controlled environments, with access limited and logged. We do not keep copies after the project ends.
Yes. We plan staged loads and a short, rehearsed cutover so daily operations continue as long as possible. Changes made during the move are captured and synchronised. A rollback plan is prepared in case something fails at switch-over.
We reconcile record counts, totals and sampled records between source and target after each trial load. Differences are logged, explained and fixed before the final run. You receive a reconciliation report to sign off, so the decision rests on evidence.
Prepare access to source and target systems, a list of data owners, known data problems and your downtime limits. Decide what history to keep and what to archive. Cleaning obvious junk early saves time. We handle the profiling and mapping.
Common mistakes include skipping data profiling, migrating everything including obsolete records, underestimating testing and having no rollback plan. Another is leaving business users out of validation. We run rehearsals, involve data owners in sign-off and keep a tested way back.
Tell us about your project and get a free consultation and estimate within 24 hours.
NDA on request You own the IP No obligation Free estimate
A solutions consultant will reply within one business day with next steps.
Tell us about your project and we’ll reply within one business day. Fields marked * are required.
We couldn’t send your message just now. Please try again, or email us at hello@kramate.com.